More ground floor, without leaving the street you live on

We build rear, side return, wrap-around and two-storey extensions across London and the Midlands. Foundations to final coat of paint, managed by one team.

  • No deposit
  • Pay weekly for work done
  • Build schedule you can check daily
GardenStreet

Which extension suits your house?

Pick your house type, then compare the four options. Prices are guide ranges. Your quote is fixed after we've surveyed the site.

Your house

GardenStreet

Plan view. The house is at the top, the garden below.

Single-storey rear

Builds out into the garden across the back of the house. The usual way to get an open-plan kitchen and dining space.

Guide price
£65k to £130k
Best for
Almost any house with garden depth to give up
Planning
Permitted development up to 3m beyond the original rear wall, or 4m on a detached house. Up to 6m and 8m with prior approval from the council.
Build time
12 to 16 weeks on site

Going a metre deeper costs far less than the first metre, because foundations, roof and the structural opening are already paid for.

Prices move with the house you pick, because a terrace is narrower than a detached and there is less to build. Guide prices reflect typical 2026 London rates and include VAT. Kitchens, glazing and landscaping are priced separately. Build times are for work on site and don't include drawings or approvals.

What your quote covers

So you can compare us fairly with other builders, here’s exactly what is and isn’t in a Promaester quote.

Included

  • Foundations, drainage runs and any manhole alterations
  • Steel beams and forming the opening into the existing house
  • Brickwork chosen to match the existing house
  • Roof, rooflights, gutters and downpipes
  • Electrics, plumbing, plastering and decoration
  • Booking and attending every Building Control inspection

Quoted separately

  • Scaffolding, surveyed and quoted by our scaffold contractor
  • Kitchen units, worktops and appliances
  • Bifold doors, sliders and structural glazing, priced as an allowance
  • Party wall surveyor fees and architect drawings, if you don't have them yet
  • Garden landscaping outside the new walls

From first visit to finished room

Five stages. We manage each one and tell you what’s needed from you before it starts.

  1. Survey

    We visit, measure, check the structure and tell you what's realistic for your house.

  2. Drawings and calculations

    Architect plans and structural calculations, ready for Building Control.

  3. Approvals

    Lawful development certificate or planning, Building Control and party wall notices.

  4. Build

    The new shell goes up outside your existing wall first. We only break through once it's weathertight.

  5. Sign-off

    Building Control completion certificate and electrical certificates handed to you.

No deposit. You pay for progress, every Friday.

You never pay ahead of the work. Each Friday you pay for what was built that week, and only if the job has moved forward.

  • A live build scheduleShared with you as a Google Sheet and updated daily, including Building Control inspection dates.
  • Predictable site hoursMonday to Friday, 8am to 5pm, with a team of four to five on site.
  • A considerate siteNo radios and no smoking, at any point in the job.

Recent work

Photos from jobs we've built.

Every extension in our portfolio

See all our work

Questions people ask before booking

A single-storey rear extension can go 3m beyond the original rear wall, or 4m on a detached house, and no more than 4m high. Those limits rise to 6m and 8m if the council grants prior approval, which involves consulting your neighbours. Anything more than one storey is limited to 3m and must stay 7m from the rear boundary.

Extension guides

Straight answers on cost, planning and layout, written by the team that builds them.

GardenStreet
Costs

How much does a lean-to extension cost in north London? (2026)

What a lean-to extension costs in north London in 2026: our recent single-storey quotes, London cost per m², the roof, planning, build time and fees.

6 min read
Planning

Loft conversions and permitted development in Barnet and Haringey: what you can build without planning

Most rear dormer lofts in Barnet and Haringey need no planning. The 40 and 50 cubic metre limits, conservation areas, Article 4 and each council's dormer rules.

Planning

Do I need planning permission for a rear extension in Enfield?

Usually not, for a single-storey rear extension in Enfield. Permitted development limits, prior approval, conservation areas, Article 4 and Building Regs.

Costs

How much does a rear extension cost in north London? (2026)

What a single-storey rear extension costs in Enfield, Barnet and Haringey in 2026: our recent quotes, London cost per m², fees and what moves the price.

Costs

What a rear extension really costs in 2026

Why the first metre is the expensive one, what sits outside most quotes, and how to compare builders fairly.

Planning

Do you need planning permission for a loft conversion?

Permitted development in plain English: the volume limits, the front slope rule and when you need a full application.

Extensions

Is a side return infill worth it on a narrow terrace?

The smallest footprint of any extension, and often the one that changes daily life the most. Here's when it pays.

Extensions

Build up or build out: which should you do first?

A loft and a rear extension solve different problems. If you can only do one now, this is how to choose.

Planning

Party wall notices, explained without the jargon

When you need to serve notice, how long your neighbours have to reply, and how to keep it friendly.

Book a survey

We’ll visit, measure up and tell you what’s realistic for your house, along with a guide price for each option worth considering.

Prefer to talk it through?0800 099 6660