Lofts, extensions, refurbishments

Add a bedroom and bathroom without moving house

We design and build loft conversions across London and the Midlands. One team from survey to Building Control sign-off, and a fixed, itemised quote before any work starts.

  • No deposit
  • Pay weekly for work done
  • Build schedule you can check daily

Which loft conversion suits your house?

Pick your house type, then compare the four options. Prices are guide ranges. Your quote is fixed after we've surveyed the roof.

Your house

Section through the roof. The figure is 1.8m tall.

Rear dormer

A box-shaped extension off the back slope gives standing height across most of the floor. Room for a bedroom and shower room.

Guide price
£53k to £89k
Best for
Terraced and semi-detached houses
Planning
Usually permitted development, within 40m³ on a terraced house or 50m³ on a semi or detached house
Build time
6 to 8 weeks on site

The most common loft conversion and usually the best value for the space you gain.

Prices move with the house you pick, because a terrace is narrower than a detached and there is less to build. Guide prices reflect typical 2026 London rates and include VAT. Scaffolding is surveyed and quoted separately. Build times are for work on site and don't include drawings or approvals.

What your quote covers

So you can compare us fairly with other builders, here’s exactly what is and isn’t in a Promaester quote.

Included

  • Steel beams and new floor joists to the structural engineer's design
  • Dormer or gable build, roofing and lead work
  • Insulation, plasterboard and skim finish
  • New staircase and fire-rated doors
  • Electrics and mains-wired smoke alarms
  • Booking and attending every Building Control inspection

Quoted separately

  • Scaffolding, surveyed and quoted by our scaffold contractor
  • Party wall surveyor fees, if your neighbours appoint one
  • Architect drawings and structural calculations, if you don't have them yet
  • Bathroom fittings and flooring you choose, priced as allowances

From first visit to finished room

Five stages. We manage each one and tell you what’s needed from you before it starts.

  1. Survey

    We visit, measure, check the structure and tell you what's realistic for your house.

  2. Drawings and calculations

    Architect plans and structural calculations, ready for Building Control.

  3. Approvals

    Lawful development certificate or planning, Building Control and party wall notices.

  4. Build

    Most work happens from the scaffold. We open into the house when it's time to fit the stairs.

  5. Sign-off

    Building Control completion certificate and electrical certificates handed to you.

No deposit. You pay for progress, every Friday.

You never pay ahead of the work. Each Friday you pay for what was built that week, and only if the job has moved forward.

  • A live build scheduleShared with you as a Google Sheet and updated daily, including Building Control inspection dates.
  • Predictable site hoursMonday to Friday, 8am to 5pm, with a team of four to five on site.
  • A considerate siteNo radios and no smoking, at any point in the job.

Recent work

Photos from jobs we've built.

Loft bedroom with eaves storage in Bromsgrove
Loft bedroom with eaves storageBromsgrove
Loft ensuite in Bromsgrove
Loft ensuiteBromsgrove
New loft staircase in Bromsgrove
New loft staircaseBromsgrove

See all our work

Questions people ask before booking

Most rooflight and rear dormer conversions are permitted development if the new roof space stays within 40m³ on a terraced house or 50m³ on a semi or detached house, stays below the ridge, and doesn't extend the front slope facing the road. Mansards, flats and houses in conservation areas usually need planning. Every loft conversion needs Building Regulations approval.

Book a survey

We’ll visit, measure up and tell you what’s realistic for your house, along with a guide price for each option worth considering.

Prefer to talk it through?0800 099 6660