Portfolio / Loft conversions

Loft conversion in Birmingham

Photographed from the first survey visit through to handover.

The job

Before we started, this loft in Birmingham was dark storage under bare rafters.

Headroom was the problem. To solve it, all of the ceilings below had to be pulled down. Because there's a new floor, we lowered it to get that height in. Then the dormer went on from the outside.

With the new ceiling joists and floor in, we fitted roof windows and finished it as a carpeted room. The photographs follow it from the empty loft, through the build, to the finished room.

Work
Loft conversion with dormer
Main challenge
Headroom, solved by lowering the new floor
Payment
No deposit. Paid weekly in arrears, every Friday

About loft conversions

Before

During the build

Finished

Thinking about something similar?

We’ll visit, measure up and tell you what’s realistic for your house, with a guide price for each option worth considering.

Book a survey